Stainless Steel Expanded Metal Mesh Machine

Model NO.: DP25-16
Material Thickness: 0.2-1mm
Overall Dimensions: 1740X1400X1500mm
Net Weight: 2t
Trademark: JIAKE
Transport Package: Wooden Pallet and Plastic Film in The Container
Origin: Hebei, China
HS Code: 8463300000
1.Description
The DP series expanded metal mesh machine can process steel plate width from 500mm-     2000mm,thickness from 0.1mm-4mm.
Application: The metal mesh produced by this machine is extensively used in construction, hardware, window and door, machine protection, etc.
Suitable wire material for this machine are low-carbon steel plate, stainless steal plate, aluminum plate, copper plate, etc
2.Advantages
  1. High production
  2. Extensive use
  3. Energy saving
  4. Easy maitenance and operation
3.Machine pictures and parameter
Model DP25-6.3 DP25-16 DP25-25 DP25-25
Material thickness 0.1-1mm 0.2mm-1mm 0.3mm-1.5mm 0.5-2.5mm
Material max. width 500mm 1000m 1250mm 1500mm
Stroke per minute 180times/min 150times/min 280times/min 100times/min
LWD of mesh opening 20mm 25mm 30mm 80mm
Distance of feed 0-1.2mm 0-1.2mm 0-1.2mm 0.2-4mm
Motor 2.2kw 3kw 4kw 11kw
Overall dimension 1090×710×1450 1740×1400×1500 1940×1600×2010 2870*990*
Net weight 0.95T 2T 3T 6T
 
Model DP25-63 A DP25-63 B DP25-100
Material thickness 0.5mm-2.5mm 0.5mm-3.0mm 0.5mm-4mm
Material max. width 2000mm 2000mm 2000mm
Stroke per minute 70 times/min 45times/min 60times/min
LWD of mesh opening 100mm 150mm 150mm
Distance of feed 0-4mm 0-4mm 0-4mm
Motor 11kw 11kw 15kw
Overall dimension 3600mm×2500mm×3000mm
Net weight 10T 10T 12T


Stainless Steel Expanded Metal Mesh Machine


Stainless Steel Expanded Metal Mesh Machine

Stainless Steel Expanded Metal Mesh Machine

Stainless Steel Expanded Metal Mesh Machine

Stainless Steel Expanded Metal Mesh Machine



4.Commercial terms
Payment Term T/T.30% as advance, 70% balance before loading.
Delivery time 10 days after your advance payment.
Certification CE and ISO 9001 Certificate
Warranty One year since the machine is installed at the buyer's factory and within 18 months against B/L date
After sales service Our engineer can do the installation and train the workers in your factory  

Nut/Grain/Cereal Processing Machine

Complete Production Line,Sterilization Machine Co., Ltd. , http://www.nsfoodmachine.com

Posted on