It's used to produce rigid celuka WPC foam board with size of 1220/5-20mm which are mostly used for furniture, bathroom cabinet, construction template.
Production flow of WPC foam board:
Material batching mixing_extruding_molding_vacuum calibrating and cooling_hauling_cutting- final WPC foam boards
Equipment List:
PVC mixer
-PVC WPC foam board extrusion line
(Including autoloader, conical twin screw extruder, mould, calibration table, hauling machine, auto cutter- stacker)
- lamination machine(for furniture foam board)
- hot stamp printer (for furniture foam board)
- waste rusher& PVC miller
- Air compressor
- Water chiller
WHY CHOOSE SUKE? Â
(1) We have experiences in this field since 2002Â
(2) We have strong technical teams and cooperate with China scientific institution to develop, improve and test our machine, to ensure what customers get are the most reliable machines from China.Â
(3) We select the most reliable mechanical and electrical parts for our machine with all famous reliable brands, with European CE certificated.Â
(4) We put our heart into every business with aim of long term cooperation.Â
(5) We have perfect service system-- Our president is devoting himself to pre-sale, on-sale and after-sale service.Â
Thickness (mm) |
2mm to 20mm |
Width (mm) | 1220, 915mm |
Length (mm) | 2440, 3050 |
Standard Color | White |
Density (g/cm3) | 0.45 - 0.8 |
Pulling strength(MPa) | 12-20 |
Bending strength(MPa) | 12-18 |
Elastic modulus in bending (MPa) | 800-900 |
Impact strength (KJ/m2) | 8-15 |
Breaking elongation (%) | 15-20 |
Vicat softening point | 73-76° C |
Shore hardness | 45-50 |
Water absorbing capacity (%) | ≥ 1.5 |
Flame retardancy | The self-extinguishing time away from the flame is less than 5 seconds  |
TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method:Â Packing film or wooden case
Guaranteed Time:Â 12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours.Â
Â
The Timeplex group is one of the leading manufacturers of Metal Stamping Components, plastic injection parts, Heatsink , electronics / industrial consumer products and home appliances products, R/C drones in China ,founded in 1989.
We specialize in LED driver & Switching power Metal Stamping Parts and plastic parts for Osram ,BAG,Delta etc for many years ,here are some products recommended to you :
More services we offer:
Besides of Metal Stamping components, we also complete solution for OEM/ODM Products & components, offer services of deep drawing services, EMI metal shielding parts, Heat Sink , Plastic Molding products for custom, Plastic Injection Components, Metal Stamping Parts, home appliances accessories ,R/C drone and smart electronic toys etc.
Metal stamping Led driver Metal Base
LED Metal Base,Base Metal,LED Metal Stamping Base,Metal Stamping Blanks Wholesale
Timeplex Industrial Limited , https://www.timeplexhk.com